Biodeg Chemical Co. - The Professionals in Contract Manufacture
Homepage Company History Products Contract Manufacturing Standards and Approvals Contact Us

Handling Facilities

 

Plant and equipment currently available includes:-

Bulk tanks from 20,000 to 56,000 litres, many with heating jackets and either lined or in stainless steel.

Reactors from 400 to 20,000 litres in glass and stainless steel. Specialist reactors capable of routinely handling viscosities up to 10,000 cps.

Electrically heated reactors for use up to 200c.

Powder blenders from 50 to 500 litres.

Forklift trucks with lifting capacities ranging from 1.6 to 2.5 tonnes with masts from 'container spec.' to 9.5 metres.

Internal racked general chemicals storage for 3,000 pallets, separate food ingredient storage for 900 pallets + external storage for low budget use.

Container stuffing and unstuffing ramps.

Extensive laboratory facilities for routine testing and approvals.

Heating equipment capable of melting drummed material at temperatures up to 165°c or storing packed materials under accurately controlled temperatures up to 80°c.

Along with which is the usual equipment and services expected in a modern chemical plant.

Even with the above extensive facilities we are always willing to discuss the installation of additional plant to meet customers specific requirements.

 

A view of Area 300 showing the east wall of Area 100 to the rear.

Area 100 has been converted to Narrow Aisle racking to increase internal storage capacity

 

Biodeg Chemical Co. Edwards Lane, Speke, Liverpool L24 9HW, U.K.
Telephone:
+44 151 486 1873 Fax: +44 151 486 1863 E-Mail: webtraffic@biodeg.co.uk